PROJECT ENGINEERING

CENTRAL GATHERING STATION 10 - DURI OILFIELD


We were proud to have the first engineering packages entrusted to us in 1999-2000 by PT. IKPT as contractor for PT.Caltex Pacific Indonesia (now known as PT. Chevron Pacific Indonesia) for their 10th Central Gathering Station (CGS) for oil lifing activities in Duri, part of Riau Province of Indonesia. in this project we succesfully installed 2 skid packages comprises of 4 units of Sullair oil injected air compressors model LS16-100HAC and dryer packages as Air instruments to their Oil lifting applications.

BELANAK WELLHEAD WHPA AND WHPB - SOUTH NATUNA SEA BLOCK B


In 2003-2005,
we have our 1st offshore project for Conoco Philips via its contractor PT.McDermott Indonesia.
Belanak Wellhead
The project was to build two wellhead platforms, 38 wells, a floating storage and offloading (FSO) unit for liquefied petroleum gas (LPG), and a-60 miles 24 inch gas export pipelines and intra field pipeliness off the Natuna shore (in between Thaiand, Kalimantan, and Malaysia). Belanak was expected to produce of 600 bcf of natural gas and 100 million bbl of oil, condensate, and LPG. We supplied 2 sets of skid packages as Air instruments to meet requirement of Class 1 Div 2, NEMA 4X environment, comprised of 4 units Sullair oil injected air compressor model LS 20-100 HHAC and dryer packages

PETROCHINA BETARA JABUNG COMPLEX DEVELOPMENT


Betara Complex Development (BCD) Onshore and Offshore project in 2003 aimed at producing the sales gas to Singapore out of the gas fields in the Jabung Block in Jambi Province, Central Sumatra. LPG and condensate produced from gas processing and fractionation, will be shipped out through Floating Storage and Offloading (FSO) unit in offshore via pipelines. The Plant targets for 100 MMSCFD (million metric standard cubic feet per day), 22,200 BPD (barrel per day) of LPG, 27,000 BOD of Condensate. We worked with two engineering contractors, IKPT Chiyoda and Sempec Indonesia, and installed 5 sets of skid packages, comprised of 3+2 units Sullair oil free (air cooled) air compressor DS 13-200 and DA 13-125 HAC and 2 units oil injected aircompressor model LS 100-25 HAC

TUBAN AROMATIC PLANT PROJECT


in 2004 WAIJO Consortium appointed us to provide air supply for their Aromatics plant project for PT Trans Pacific Petrochemical Indotama. The plant target capacity was 700,000 tonnes per year (t/y) of ethylene, 380,000 t/y propylene, 250,000 t/y LLDPE/LHDPE, 170,000 t/y LDPE and 300,000 t/y styrene monomer. We installed four (4) FS-Elliott centrifugal air compressor and dryer packages providing oxygen needs in the chemicals production process.

CHEVRON PACIFIC INDONESIA
WAF 118 IMPROVEMENT PROJECT & DURI IMPROVEMENT PROJECT


PT Chevron Pacific Indonesia via Tripatra - Fluor Consortium appointed us in 2006 for their WAF-118 pilot improvement project. It was a CPI Instrument Air Reliability Improvement Project for Area 1,3,8 and 9 in Duri, Riau. We installed 9 sets of skid packages, comprised of 18 units Sullair air compressor model ES 8-15 HAC. Subsequent to the success of the pilot project, PT Chevron Indonesia re-appointed us back in 2007 and 2008 to do their CPI Instrument Air Compressors for Duri Enhanced Oil Recovery project.

Belanak Wellhead
In this project, we installed 32 sets of skid packages comprised of 64 units Sullair air compressor model 1109AC making it the biggest milestone for us to date.

POROUS PRILL AMMONIUM NITRATE PLANT PROJECT


in 2009, we were appointed to supply Instrument Air packages for Project: KNI Orica Ammonium Nitrate Prill Plant, an investment of ORICA-Australia, aiming to increase supply of dynamites of more than 50% to meet Indonesian mining business requirements. We installed 3units Sullair oil injected air compressor model LS-20S-175HHWC and met the non yellow metal specification, which is suitable for nitric acid environment.

Pre 2009,production of Ammonium Nitrate only meet around 20% of mining needs.

LIBO BIOGAS PLANT


in 2010 we had our first gas compressor project in Libo, Sumatera for PT Chevron Pacific Indonesia. Thiss project is to enable gas collection and remove flare gas waste for environmental commitment. We installed 1 unit Vapor Recovery Unit (VRU) / Gas Compressor Package, comprised of following:

  • Gas Production of 0.9 MMSCFD
  • Inlet / outlet pressure : 2.0 / 50.0 PSIG
  • Oil flooded screw gas compressor, Gardner Denver model SSQG99C
  • Coupled to Marathon 125 HP motor
  • Completed with ASME rated Inlet Scrubber and Gas/Oil Separator, Oil Cooler and Instrumentation
  • Electricals requirement met Class.1 Div.2 Gr.D Area

PERTAMINA RU VI BALONGAN RETROFIT PROJECT (2010 - 2016)


PT. Pertamina RU VI Balongan appointed us do a pilot project of Retrofit PLC-ASC Plant Air Compressor in 2010. In the project, we had to manage controller and instruments change of the existing air compressors to enable communication with the Central control room. the Scope was PLC-ASC Plant Air Compressor, Transmitters within Racks, Installation, startup and commissioning.

Belanak Wellhead
Following the success of the pilot project, we were continually trusted to carry the retrofit work for Pertamina other plants in Balongan in 2012, 2013, 2015, and 2016. Total retrofitted centrifugal compressors completed to date is 6 out of 7 compressors.

PERTAMINA MERUAP


*in 2014, we were proud to be able to supply portable gas compressor to Pertamina meruap, a rental company. We committed to ensure output is as determined and agreed to meet the rental business demand.