PT Chevron Pacific Indonesia via Tripatra - Fluor Consortium appointed us in 2006 for their WAF-118 pilot improvement project. It was a CPI Instrument Air Reliability Improvement Project for Area 1,3,8 and 9 in Duri, Riau. We installed 9 sets of skid packages, comprised of 18 units Sullair air compressor model ES 8-15 HAC. Subsequent to the success of the pilot project, PT Chevron Indonesia re-appointed us back in 2007 and 2008 to do their CPI Instrument Air Compressors for Duri Enhanced Oil Recovery project.